
Inside NMP Golf Construction’s race to rebuild Detroit Golf Club on a PGA TOUR deadline
When NMP Golf Construction took on the North Course restoration at Detroit Golf Club, the finish line wasn’t simply the last day of construction, it was the day the Rocket Classic arrived. Working backward from a fixed PGA Tour date, NMP compressed what Darryl Bartlett called “10 months of work packed into five,” running drainage, irrigation, earthwork, shaping, and grassing simultaneously across a divided course with more than 110 crew members at the project's peak.
The work went far deeper than what players would ever see. Excavations reached 18 feet below the surface to connect a new storm drainage system at the required pitch, while above ground, robotic total station technology ensured every green was shaped to its approved elevations before being cored out and rebuilt to USGA spec. Precision machinery handled the broad strokes; experienced craftspeople finished the contours, bunker edges, and subtle transitions by hand.
What made it possible was trust. Trust between NMP, architect Tyler Rae, and the Detroit Golf Club agronomy team, trust built over roughly a decade of working together. When challenges arose, decisions were made quickly and efficiently so everything kept moving. The renovated North Course was ready when the Rocket Classic arrived, and Bartlett’s measure of success is simpler than any tournament result: “We got it right.”
Read the full story → Golf Course Trades


